Green Flex – Mobilizing Operational Flexibility in Green Energy Production

The objective in project Green Flex is to develop and demonstrate a software tool named FlexIQ that can support economic optimal planning and control of integrate green energy plants in mobilizing flexibility for power and heat markets. The tool will close the gap between the market needs and the potential responsiveness of existing energy plants

Project description

Green Flex will develop and demonstrate a pilot version of a model-based tool, named FlexIQ, at Sønderborg Fjernvarme. FlexIQ will support overall optimization in daily operation by delivering future predictions on key performance measures, answering key questions:

  • How much flexibility can we offer to the market, e.g. regulation power and intra-day, tomorrow?
  • What is the span of possibilities if we take the flexibility of the district heat supply in to account?
  • How and why does it change the fuel costs of the subsystem?
  • How does it change the environmental impact?
  • How does it affect maintenance costs in term of wear and service life consumption?
  • Which failure conditions or performance reductions should be taken into account?

FlexIQ will have several types of subscribers pursuing optimal operation:

  • Plant operators will have to monitor efficient, safe and reliable operation
  • Load scheduling either done manually or supported by a software tool
  • Control system to optimize set-points for sub-plants and sub- systems
  • Planning and reporting personnel, etc.

The end product will have several value propositions for the end user: Optimized market bids, minimized operational costs and minimized maintenance costs. Altogether, pay-back time of the end product is expected to be less than 1 year for customers. The market potential is large within Danish CHP production and additional potential has been identified within international CHP and related industries. Furthermore, development of multi-product plants (power, district heat, biofuel, hydrogen, district cooling, etc.) will extend the potential.

Key figures

Period:
2013 - 2015
Funding year:
2013
Own financial contribution:
1.48 mio. DKK
Grant:
5.41 mio. DKK
Funding rate:
78 %
Project budget:
6.89 mio. DKK

Category

Programme
EUDP
Case no.
64013-0133

Participants

Added Values (Main Responsible)
Partners and economy
Partner Subsidy Auto financing
Added Values 3,08 mio. DKK 0,84 mio. DKK
SØNDERBORG FJERNVARME AMBA 0,26 mio. DKK 0,14 mio. DKK
Aalborg Universitet (Fredrik Bajers Vej) 1,69 mio. DKK 0,28 mio. DKK
EMD INTERNATIONAL A/S 0,37 mio. DKK 0,22 mio. DKK