IEA Wind Annex 25 - phase V

With the growing importance of integration of wind energy into power systems, the scope of Task 25 is proposed to be enhanced and broadened and to include collaboration with integration of solar energy (IEA PVPS Task 14). The common international challenge is to adapt the existing power systems to enable a substantial increase of wind and other variable generation shares, namely PV, in a time frame considerably shorter than the lifetime of the assets

Project description
The common international challenge is to adapt the existing power systems to enable a substantial increase of wind and other variable generation shares, namely PV, in a time frame considerably shorter than the lifetime of the assets, meaning that this has to be done in most utility systems with existing infrastructure, and at economically feasible costs. Task 25 supports this goal by analysing and further developing the methodology to assess the impact of wind power on power systems and by producing information on the range of impacts and best practices to assess the impacts
Expected results are: Enhanced international collaboration and coordination in the field of wind and PV integration; Set of case studies on wind and other variable generation integration, especially cases combining wind and PV, implications on market design and operation and evolved methodologies including assessment of costs and value of wind integration, uncertainty assessment and additional operational methods incorporated into planning models; Database for large scale wind power production time; Collaborative journal articles; Workshops targeted for TSO audience; Updated Recommended Practices report; Updated summary describing the range of wind power impacts and costs for different power systems.
DTU will contribute to the annex through participation in the meetings and sharing of the research. Research results are foreseen to be in the areas: Tools and methods for representing wind power variability and uncertainty in power system reliability; Wind power plant control; Ancillary services from wind power plants; Inclusion of wind power uncertainties in power system reliability assessment.

Key figures

Period:
2018 - 2020
Funding year:
2018
Own financial contribution:
0.16 mio. DKK
Grant:
0.37 mio. DKK
Funding rate:
70 %
Project budget:
0.53 mio. DKK

Category

Oprindelig title
IEA Wind Annex 25 - fase V
Programme
EUDP
Technology
Wind
Project type
IEA
Case no.
64018-0121

Dokumenter

Participants

Danmarks Tekniske Universitet (DTU) (Main Responsible)
Partners and economy
Partner Subsidy Auto financing
Danmarks Tekniske Universitet (DTU) 0,37 mio. DKK 0,16 mio. DKK

Contact

Kontakperson
Nikolaos-Antonio Koutouloulis
Comtact information

Frederiksborgvej 399,
4000 Roskilde
Tlf.: 4677 5085
Telefax: 4677 5085

Contact email
niac@dtu.dk